How It Works

We buy the unit, plan the rigging and take it away, with the paperwork settled before the truck moves.

What we buy

Ranges we buy on this page

Transformer Buyers NC buys used, surplus, failed, and obsolete transformers throughout North Carolina. This page follows the work from the first nameplate photograph through inspection, purchase paperwork, load-out, and the condition of the pad afterward.

Each stage identifies what the owner supplies, what must be confirmed, and why a disconnected unit can still take time to move.

PhasekVAVoltageFluid
1-phase10 - 333 kVAup to 25 kVLiquid or dry
3-phase75 - 20,000 kVA46 kVLiquid or dry

Who we buy from

Six kinds of seller

  • Recyclers
  • Electrical contractors
  • Equipment dealers
  • End users
  • Demo contractors
  • Distributors
Pad-mounted transformer chained down on a drop-deck trailer with yellow straps
A pad-mount on a drop-deck trailer, yellow straps across the cabinet.
  • Fast offers

    A written offer the same business day, based on your photographs.

  • Dedicated logistics

    Our own crew, trailer and crane, not a brokered haul.

  • No broker fees

    One buyer from first call to cleared pad, with nothing skimmed.

How it works

Six steps from photograph to payment

  1. 01

    Take pictures

    Photograph the nameplate, the inside of the cabinet and the tank from both ends. Four frames on a phone are enough to price most units.

  2. 02

    Send them to us

    Email or text the photographs with the site address and whether the unit is still energised. We reply the same business day with questions or a number.

  3. 03

    Review the offer

    The offer names the unit, the site, the price and the pickup window. It is written, dated and good for thirty days unless the unit changes hands.

  4. 04

    We schedule freight

    A crew, a trailer and a crane if the pad needs one. You get the date and the arrival window, and the site does not have to close for it.

  5. 05

    Testing on arrival

    Winding resistance, insulation resistance and a turns ratio check, plus oil analysis where the unit is liquid-filled. Results travel with the unit.

  6. 06

    Get paid

    Payment is released against the signed bill of sale and the scale ticket, by check or ACH, with the paperwork copy left on site.

What we handle

The parts sellers dread

  • Rigging

    Crane, skates and a route survey for anything that will not roll onto a trailer.

  • Oil containment

    Pans, absorbent and a spill plan before a drain plug is touched.

  • Bill of sale

    A document that clears a lien, a lease or a bankruptcy file, not a handwritten note.

  • PCB paperwork

    Testing and manifesting for pre-1979 oil, handled before the unit moves.

On the ground

Send the nameplate

Start with a readable photograph of the complete nameplate, plus photographs of the tank, bushings, radiators, and cable compartment exterior. Include the North Carolina site address and whether the transformer remains connected.

A legible serial number keeps inspection notes and purchase documents tied to the correct unit.

Supply the kVA or MVA rating, primary and secondary voltages, fluid type, and approximate dimensions if the plate is damaged. Note missing elbows, cracked bushings, or a leaking gasket.

Gathering these details may take one site visit; finding old drawings or maintenance records can take several days.

Local reality

The first conversation

The first conversation establishes ownership, condition, and the removal window. Identify who can authorize the sale and who controls access to the pad. For a leased facility or bankruptcy estate, those may be different people.

Have the site contact, operating status, and planned outage dates ready.

An accessible, disconnected transformer usually needs less coordination than a unit serving a hospital or an active production line. Allow time for follow-up about switching responsibility, cable removal, and loading access.

This stage may close in one conversation or extend while the owner confirms an outage window.

Around the site

Inspection and testing

Inspection scope depends on the unit and its history. Provide prior test reports, maintenance records, and details of any trip, internal fault, or fire. Photographs cannot establish winding condition or fluid chemistry.

Access inside an enclosure requires the owner's authorized personnel to establish safe electrical conditions first.

Where needed, testing may include insulation resistance, turns ratio, winding resistance, or fluid sampling. Agree on the scope before anyone arrives. A field visit may fit within a day, but laboratory results and scheduling can extend the review.

Supply existing PCB documentation rather than assuming age proves fluid status.

Where it sits

The offer and the paperwork

Once the equipment and removal scope are understood, the written purchase offer should identify the transformer by serial number and site. It should also state the included components, condition disclosures, and removal responsibilities.

Keep spare radiators, loose bushings, and any separate control cabinet identified rather than assumed included.

The owner supplies the legal seller's name, signing authority, and any required asset-release documents. Review who handles disconnection, fluid management, lifting, and pad cleanup before signing.

Straightforward approvals may take a few business days; corporate review, lender releases, or court authorization can keep paperwork open much longer.

On the ground

Rigging and load-out

Before scheduling pickup, confirm transport weight, lifting provisions, overall dimensions, and the route from pad to trailer. Photographs should show gates, overhead conductors, soft ground, and tight turns.

A lowboy or crane cannot be selected from the kVA rating alone; tank dimensions and actual access govern the plan.

The owner's electrical crew must complete the agreed disconnection and make the unit safe for removal. Rigging crews need a defined lifting plan, suitable lifting points, and room for outriggers or a spreader bar.

Load-out may finish in one day after preparation; permits and crane scheduling can add days.

Local reality

After the unit leaves

At departure, record the serial number, pickup date, and equipment actually removed on the agreed receipt or release document. Retain photographs of the empty pad and loading area.

These records help an asset manager close the equipment file and distinguish completed removal from work still assigned to the facility.

A cleared pad means the agreed transformer and components are gone; it does not automatically mean concrete demolition or soil remediation. Confirm those boundaries in the removal paperwork. Check for remaining cables, anchors, oil staining, and debris before closing the job.

Any spill requires appropriate containment and follow-up.

Around the site

What slows it down

Unreadable nameplates, uncertain ownership, and missing fluid records can hold up the early review. A failed transformer with a bulged tank or evidence of an internal arc needs a different handling assessment from an intact surplus unit.

Tell the reviewer about those conditions before arranging a site visit.

The longest delays often occur outside the equipment review: utility switching, facility outages, restricted gate hours, permit requirements, and wet ground beneath a crane setup area. Supply the access rules and outage constraints early.

A target pickup date remains provisional until paperwork, electrical isolation, and the loading plan are settled.

Local reality

Where a sale usually stalls

Most delays are not about money. They are about authority: the site contact can show the transformer but cannot release it, or the utility has not yet disconnected the service. Both are solved before a crew is booked, not on the morning of the pickup.

The second most common delay is access. A gate that is two feet too narrow, or a pad behind a fence with no turning circle, turns a one-hour job into a half-day one. Photographs settle it early.

Get started

Get an offer in minutes

Five fields is all it takes. Photographs help, but a nameplate and a town are enough to start.

No fee, no obligation. We reply the same business day.

Tell us what you have

We reply the same business day.

or call (614) 715-3047

Questions

Straight answers

Equipment types

Can the process start before the transformer is disconnected?

Yes. Nameplate review, ownership confirmation, and removal planning can begin while the unit remains connected. State its operating status and the proposed outage window. Inspection access and load-out must wait for the appropriate safety preparations, with disconnection responsibilities agreed in advance.

Service area

What if the nameplate cannot be read?

Send photographs of the damaged plate, tank, bushings, and any equipment labels. Supply drawings, test reports, or asset records showing the rating and serial number if available. Missing identification may require an inspection before the equipment and removal scope can be confirmed.

Payment

Does pickup include removing the concrete pad?

Not automatically. The written removal scope should distinguish transformer pickup from cable removal, anchor removal, concrete demolition, and cleanup. Identify oil staining or known leaks before scheduling. Photograph the pad after load-out and record any remaining work assigned to the owner or another contractor.

Logistics

The offer and the paperwork: what should a seller know?

Once the equipment and removal scope are understood, the written purchase offer should identify the transformer by serial number and site. It should also state the included components, condition disclosures, and removal responsibilities.

One buyer, start to finish